Saturday, January 9, 2010

New year, new bathroom

We've been busy since my last post. The bathroom is nearing completion (yay!).

We finished the crown molding (except for one more coat of paint):


Installed our sink:


Got the bathtub upstairs and installed it and the toilet:


Now, all we have to do is to hang the wall and door trim (which is stripped and ready for paint), put another coat of paint on the crown molding, install the shower riser and shower curtain over the tub, and install our towel racks and shelves.

Oh. And find the door. When we demoed the 2nd floor, we removed and labeled each piece of trim oh so carefully. We then took all of the doors off of their hinges and stacked them in the upstairs kitchen...without labeling. So we might have a plastic doorway to start.

Here's a fun peek at the before/after post I'll be writing in a couple of weeks:

Before:



After:


Quite a difference, isn't it?